AI compute moat · snapshot 14 Nov 2026

How far ahead is NVIDIA?

NVIDIA and AMD now launch accelerators at the same yearly pace, so the launch calendar is not where NVIDIA leads. It leads on volume, margin, software, and on reaching rack scale about two years sooner. Intel is the one off the pace.

12 Nov 2026

Jensen Huang resigned as CEO and left the board, effective immediately. CFO Colette Kress is interim CEO while the board searches for a successor. NVIDIA reports its October quarter on Tuesday 17 November. The section Without Jensen covers what that could do to the roadmap.

NVIDIA roadmap scenario
Drag to rotate · scroll to zoom · right-drag to pan · click a block

Launch cadence, in numbers

Dates are quarter-level and mix first shipment with volume availability, so treat the gaps as approximate. Google's TPU steps are sourced to the year only and drawn at mid-year. Refreshes on the same architecture (H200, Blackwell Ultra, MI325X) count as launches because that is how each vendor fills its yearly slot.

Without Jensen

The calendar through 2027 is the least exposed part of NVIDIA: the chips are designed and the supply is booked. The exposure is in coordination, in Feynman, and in whatever comes after it.

What happened

  • Huang resigned as president, CEO and director on 12 November 2026 after a board investigation. The company's release gives him no continuing role.
  • Colette Kress is interim CEO and keeps the CFO job. Harvey Jones became the board's first chair.
  • The board said it had no prearranged succession plan, will weigh internal and external candidates, and had not yet picked a search firm as of 13 November.
  • The board's stated expectation is that operations, customer commitments and the product roadmap continue without interruption.

What is already locked

  • This year's platform. Vera Rubin is in full production and shipping, with the volume ramp this quarter.
  • The next two steps. Rubin Ultra is due in the second half of 2027 and Feynman sits on the roadmap for 2028. Goldman Sachs describes development of both as well underway.
  • Design lead time. Chips take years to design, so what NVIDIA sells in 2027 and 2028 is largely decided.
  • Supply. About 60% of TSMC's 2026 CoWoS packaging capacity is already NVIDIA's.

What depended on him

  • Coordination. About 60 executives reported to him and there is no chief operating officer. One portfolio manager called him the conductor of a very complex system. In a supply-constrained ramp, that arbitration between chip, rack, network, software and supplier sets the pace.
  • Supplier and customer leverage. SemiAnalysis's Dylan Patel expects a successor to struggle to match his pull over the supply chain.
  • The bets after Feynman. Feynman is the last architecture defined on his watch. NVIDIA's own later documents give it no year.
  • Where a slip would show first, on Patel's list: Rubin's yield ramp, Rubin Ultra's specification, Feynman's timing, software support and supply allocation.

Three scenarios for the roadmap

ScenarioAssumesRubin UltraFeynmanPace after
PublishedA successor is named quickly, likely from inside, and engineering leaders stay.2H 20272028About 12 months
DriftA long search or an outsider, some senior exits, slower trade-off decisions.Slips one quarterSlips three quarters, into 202915 to 18 months
BreakA failed search or an engineering exodus. The yearly beat is abandoned.Slips two quarters, into 2028Two years later, 2030About 24 months, the pre-2024 rhythm

The slip sizes are my assumptions for illustration, not forecasts. Pick a scenario above the 3D view to see NVIDIA's staircase move against AMD's.

My read

Treat Published as the base case for Rubin Ultra: it is a step on an architecture that is already shipping. Treat Drift as a live risk for Feynman, which is a new architecture arriving after 12 to 18 months of the execution risk Goldman flags. Break needs a failed search or senior engineering exits, and neither has happened.

The cost of drift is concrete because AMD is already on a yearly beat. If NVIDIA stretches to 18 months while AMD holds 12, AMD gains one launch on NVIDIA every three years. That narrows the hardware gap; it does not touch the software, supply and volume layers in the other view.

What to watch

  • 17 November call. Whether management restates Rubin Ultra for the second half of 2027 and the yearly cadence.
  • Who gets the job, and how fast. An engineer from inside points to continuity; analysts name Ian Buck, who helped build CUDA. A long outside search points to drift.
  • Senior engineering departures over the next two quarters.
  • The spring 2027 GTC roadmap. Whether Feynman keeps its 2028 slot.
  • AMD's MI500 timing and Helios volumes.

What research says about founder exits

  • A study of US public companies whose founder-CEO died suddenly (1979 to 2002) found citation-weighted patents fell 43.8% once a professional CEO took over, though R&D spending held steady. Inventors leaving was one mechanism.
  • A working paper on CEO turnover in general (1993 to 2005) found more patents in the years after a change.
  • Neither measures launch dates and neither sample looks like NVIDIA. Read them for direction, not size.

Moat today, as a table

Select any cell to open it in the Moat today view above, with its date, caveats and sources. The grey figure is that value as a share of NVIDIA's.

Read this before trusting it

  • AMD's and Intel's data center lines are mostly server CPUs. Neither release gives a GPU-only figure, so the gap in accelerators alone is wider than the revenue columns show.
  • Custom silicon uses Broadcom as a proxy in the moat view and Google's TPU in the cadence view. Neither covers the whole category.
  • The quarters do not line up: NVIDIA's ended 26 July, Broadcom's 2 August, AMD's and Intel's 26 September 2026.
  • NVIDIA reports the quarter it guided to $108B on 17 November, so its columns go stale first. The moat scores were set on the record under Huang.
  • Share and packaging figures are analyst estimates and vary by tracker. The three translucent moat layers are my own 0 to 10 scores.
  • In Raw units, each floor band has its own scale: dollars to $100B, percent to 100%, scores to 10.

Sources

    Not investment advice. Figures are as reported or estimated on the dates shown and are not updated live.